Skip to main content

Hardware assembly: commissioning checklist

The short version for someone who has set up a FRAME before. The teaching version with photos is the unboxing tutorial. The steps follow a commissioning of an ID10–ID20 unit in November 2026.

Order of work​

  1. Lift the unit out by the solid surface under the stage. It weighs about 25 kg: lift with two people.
  2. Remove the three transport locks under the sample holder and store them at the back.
  3. Screw the lamp arm to the back with its two screws. This is done once.
  4. Check the optics drawer. The camera sits in the last cube and must be fastened. To take the drawer out, release its clamp completely first.
  5. Screw in the objectives and put the sample holder back.
  6. Connect the cables in the order of the table below. Power comes last.

Cables​

CableFromToNote
CAN, 4-pinlamp arm and every moduleany free CAN socket on top of the electronics boxall sockets are the same bus
Cameracamera in the drawerblue USB 3 portfasten the plug at the camera
Short USBUSB-C "ESP32"USB port of the Raspberry Pithe Raspberry Pi talks to the HAT+ over this cable
Overview cameralamp armUSB 2, through the hub
TriggerSMA "camera trigger"trigger input of the cameraneeded for fast scans
Emergency-stop plugsupplied plug or buttonEMG STOPwithout it the motors, lamp and lasers get no power
Wi-Fi stickUSB 2internet over Wi-Fi while the built-in Wi-Fi serves the hotspot
Networkwall socket or routerLANoptional, the simplest way to the internet
USB-C "Raspb."your computeroptional network link over USB; Windows needs a driver, see connectivity
Power, 12 Vsupplied power supplybarrel jack at the side of the electronics boxlast

First power-on​

  1. Plug in power. The lamp flashes white and the Raspberry Pi starts.
  2. After about a minute the Wi-Fi network openuc2-<machine name> appears. The machine name identifies the unit, like a serial number. Connect and open the landing page as in first connection.
  3. Open ImSwitch and follow the quick tour. Start the homing when it is offered: the stage lifts, each axis runs to its end switch, and the stage then moves to about the centre.
  4. Run the stage calibration with the pinhole slide: calibrate the stage. It finds the pinholes, references the coordinates and then focuses.
warning

Nothing stops the objective from touching the sample holder. Keep the stage high when you move far in X and Y, and home with home all, which uses a safe order.

Readiness checks​

CheckPass when
Hotspotappears within two minutes
Landing pageopens at http://192.168.4.1
Homingfinishes on X, Y, Z and the objective slider
Live viewshows an image with the lamp on
Autofocusfinds a focus on a slide with the 10x objective
Calibrationfinds the centre pinhole
Small scana 3 x 3 scan is stored and can be downloaded in the File Manager

Software checks follow in operational readiness.