Skip to main content

Hardware Assembly

Draft outline

Scaffold. Replace the bullet prompts with your own text and delete this banner when done.

Planning decisions to make before a FRAME arrives or is redeployed.

Bench and environment

  • Space (300 x 300 x 300 mm plus clearance), flat/stable surface, vibration, light control.
  • Temperature/humidity limits for live-cell or long time-lapse work.

Power planning

  • Region/voltage (110/230 V); the included Meanwell supply; optional 12 V battery.
TODO

Notion source: TASK-FR028 Organize correct power supply for FRAME.

Choose your configuration

  • Which objectives (4x/10x/20x/60x), camera (mono/colour), illumination (LED matrix, which lasers), sample-holder type (slides / well plates / dishes).
  • Cross-link: Reference / specifications.

References